Operation Vijay (1999) · May – July 1999Operation Blue Star · 1–8 June 1984Operation Vijay (1961) · 18–19 December 1961Operation Sindoor · 7–10 May 2025Operation Bandar · 26 February 2019Operation Polo · 13–18 September 1948Operation Meghdoot · 13 April 1984 — presentOperation Trident · 4–5 December 1971Operation Pawan · 1987 – 1990Operation Safed Sagar · 26 May – 26 July 1999Operation Python · 8–9 December 1971Operation Cactus · 3–4 November 1988Operation Ganga · February – March 2022Operation Parakram · December 2001 – October 2002Operation Sankalp · June 2019 — presentOperation Raahat · April 2015Operation Talwar · May – July 1999Operation Devi Shakti · August 2021Operation Kaveri · April – May 2023Operation Maitri · April – May 2015All 20 operationsIndian Army · Service Before SelfIndian Navy · May the Lord of the Oceans be Auspicious Unto UsIndian Air Force · Touch the Sky with Glory163 platforms catalogued63% built in India22 systems inducting or in development18 supplier countries
← Back to Indian Army
Self-propelled howitzerSouth Korea · 2018 — present · Active

K9 Vajra-T

Vajra

Tracked 155mm firepower that keeps pace with armour.

2010 국방화보 Rep. of Korea, Defense Photo Magazine 육군6포병여단은 화력 전투임무 수행능력 향상을 위한 K- 9, K-55,포탄사격훈련 및 기동을 실시했다
Photo via Wikimedia by 대한민국 국군 Republic of Korea Armed Forces, licensed CC BY-SA 2.0.
Overview

About the Vajra-T

The K9 Thunder (Korean: K-9 자주곡사포; Hanja: K-9 自走曲射砲; RR: K-9 Jajugoksapo) is a South Korean 155 mm self-propelled howitzer designed and developed by the Agency for Defense Development and private corporations including Samsung Aerospace Industries, Kia Heavy Industry, Dongmyeong Heavy Industries, and Poongsan Corporation for the Republic of Korea Armed Forces, and is now manufactured by Hanwha Aerospace.

History

Service history

L&T won the self-propelled howitzer competition in 2017 with a K9 Thunder adapted to Indian requirements — desert cooling, indigenous fire control, and around half its content sourced in India. All 100 guns of the first batch were delivered by 2021, ahead of schedule; a follow-on order for 100 more was signed in 2024. Regiments have since deployed to eastern Ladakh, a role the design never anticipated.

Highlights

Combat edge

01

Deployed to high-altitude Ladakh beyond its design brief

02

Three rounds in 15 seconds in burst mode

03

Built by L&T with roughly 50% indigenous content

04

Shoot-and-scoot with automated laying